Updates and migration: switching over with minimal downtime.

Operating system change, Office migration or server update: we plan ahead, test in advance and switch over so that your business is down for as short a time as possible and no data is lost.

Network switch with patch cables

How we switch over

Carefully and to plan. The cut-over date is the end of the work, not the beginning.

  1. AnalyseWe record what is being switched over and what depends on it.
  2. Plan the cut-overProcess, sequence and timing of the switchover, so that downtime stays short.
  3. Test in advanceWe try out the switchover before it affects your business.
  4. Switch overWe carry out the switchover and check that everything runs, with no data loss.

Even when the usual tools are not enough

  • Legacy systemsA legacy system without a clean export interface needs replacing, or the standard tools cannot map your data structure. We analyse in depth, plan the cut-over and switch over without data loss.
  • DatabasesChanging database systems, version upgrades and replication: planned, tested and with a fallback option. More on database design
  • Moving premisesFor an IT relocation we plan the process, the sequence and a contingency plan, until every workstation is running on the cut-over date. IT relocation
  • Ongoing updatesWe monitor smaller updates under the maintenance contract, so that nothing piles up.

Is a switchover coming up?

Briefly describe what needs to be switched over. We plan the cut-over with you.

0173 644 22 17
Discuss a migration